Stersbury Staffing
Empty warehouse interior ready for new facility opening

New Facility Openings

From empty building to full workforce.

Opening a new facility means building a workforce from scratch — on a fixed timeline, with no margin for error. Stersbury manages the full workforce build so your facility opens staffed, oriented, and ready to operate.

A new facility opening is one of the most demanding staffing challenges an employer faces. You're building a complete workforce — often across multiple roles and skill levels — while simultaneously managing construction, equipment installation, regulatory approvals, and operational readiness. The staffing program has to run in parallel with everything else, and it has to land on time.

What makes new facility staffing different.

No existing workforce to build from

You're starting from zero — every worker needs to be sourced, screened, and placed before day one.

Multiple roles at once

A new facility typically needs workers across several roles simultaneously — general labour, machine operators, supervisors, and support staff.

Fixed opening date

Your facility opening date is set by factors outside staffing — construction, equipment, contracts. The workforce has to be ready on that date.

Onboarding at scale

Orienting a large group of new workers to a new facility requires coordination that goes beyond standard onboarding.

How Stersbury staffs a new facility opening.

01

Early engagement

We engage as early as possible — ideally 8 to 12 weeks before your opening date — to build a sourcing pipeline sized to your full workforce requirement.

02

Role mapping

We work with you to map every role in the opening workforce — headcount, skill requirements, shift patterns, and priority sequencing.

03

Sustained sourcing

We activate multiple sourcing channels and maintain a continuous pipeline through the build — replacing dropouts and building a buffer for attrition.

04

Phased deployment

We deploy workers in phases matched to your facility readiness — training groups, orientation waves, and shift-by-shift builds.

05

Opening day coordination

We coordinate first-day logistics for your full opening workforce — scheduling, site briefings, and orientation support.

06

Post-opening support

We stay engaged after opening — managing early attrition, filling gaps, and stabilizing your workforce through the first weeks of operation.

Why employers choose Stersbury for facility openings.

Early planning advantage

We engage before your opening date so we're not scrambling when construction finishes — your workforce pipeline is already built.

Multi-role capability

We manage the full workforce mix — not just one role type — so you have a single coordinated program, not multiple disconnected placements.

Opening day reliability

We plan for attrition and build a buffer so your opening workforce is complete even if some workers don't show.

Post-opening stability

The first weeks of a new facility are the highest-attrition period. We stay engaged to stabilize your workforce through that window.

Frequently asked questions.